Material Flow Performance
Usually initiated after the first two steps, the third part of the AS IS analysis is to assemble a material flow performance spreadsheet. The objective is to collect and analyze key SCOR Level Two metrics for each location.
Supply chain metrics for Level Two include:
Supplier on-time and in-full
RM inventory days of supply at locations and in transit
Transportation cost, calculated by inbound
Manufacturing Level Two metrics include:
Production schedule attainment or on-time shipment
RM,WIP,FG and returns inventory days of supply, at locations, and in transit
Transportation cost, calculated by shipments between company locations
Manufacturing lead-time, defined by actual and system setups